Energy Codes: IECC, ASHRAE 90.1 and Title 24 at a Glance

The three are often named in one breath, as though they were variants of the same requirement. They are different kinds of document with different reach.

DocumentWhat it isWhat it coversHow it gains force
IECCA model energy code published by the ICCNew construction, additions, and new systems and equipment in existing buildings, residential and commercialOnly when a state or local jurisdiction adopts it, often with amendments
ASHRAE 90.1An energy standard, titled for buildings except low-rise residentialCommercial and other buildings that are not low-rise residentialBy adoption, or as the alternative compliance path the IECC allows
Title 24, Part 6California’s own building energy codeBuildings in California, residential and nonresidentialDirectly, as state law, on permit applications from its effective date

One more rule sits above all three: federal law requires local energy codes to be at least as stringent as ASHRAE 90.1, which is why the floor moves even in places that have not adopted a new edition.

Why There Are Three, and How They Fit Together

The IECC and ASHRAE 90.1 are national documents that cover much of the same ground. Title 24 is a state code that covers it independently.

Three facts explain most of the confusion.

  • A model code is not law until adopted. Both the IECC and ASHRAE 90.1 are published nationally and have no force in any jurisdiction that has not adopted them. Local amendments on adoption are common, so the adopted edition can differ from the published one.
  • The IECC lets you use 90.1 instead. For commercial buildings, and for residential buildings over three stories, ASHRAE 90.1 is permitted as a compliance alternative.
  • You may not mix them. Where the IECC is adopted a project can follow either document, but it must satisfy all the requirements of the one it chooses. Taking the friendlier clause from each is not a compliance path.

The commercial fenestration requirements in the two are mostly aligned in any case, and the 2021 IECC aligns closely with ASHRAE 90.1-2019, so the choice is usually driven by which document the rest of the design team is working in rather than by a large difference in the glazing numbers.

Title 24 sits outside that relationship entirely. California writes and maintains its own code rather than adopting a model one, so a project in California answers to Title 24, Part 6 and to the compliance software and forms that go with it.

The Compliance Paths, and Why They Decide Everything

Before any number applies to a window, somebody has chosen a path. Each one asks a different question of the glazing.

Commercial

  • Prescriptive. Meet the stated criteria for each component, envelope, mechanical, service water heating and lighting, plus the additional efficiency option the code requires.
  • Component performance alternative. An envelope trade-off within the prescriptive path, allowing one assembly to compensate for another.
  • Total building performance. Model the proposed building against a standard reference building and show the annual energy cost is no greater, while still meeting the mandatory provisions.

Residential

  • Prescriptive. Meet the specified R-values and U-factors directly.
  • UA trade-off. Trade insulation and U-factors across the envelope so the total UA is no worse than the prescriptive baseline.
  • Simulated performance. Show the proposed home’s annual energy cost is no greater than a reference home’s.
  • Energy Rating Index. Show the rated home meets the ERI target for its climate zone.

Why this matters for glazing: the prescriptive path treats the window as a component that must hit a number on its own, while the trade-off and performance paths let glazing performance be balanced against the rest of the building. A film or glazing that fails a prescriptive limit can still be part of a compliant design on a performance path, and a performance model is also where solar control earns credit that a component table cannot see.

What the Codes Ask of Glazing

For the envelope, the requirement that reaches the window is a U-factor and an SHGC, set by climate zone and product type.

Both model codes set prescriptive U-factor and SHGC limits for vertical fenestration by climate zone, and both have tightened them over successive editions. As an indication of the order of magnitude, the fixed commercial U-factor in ASHRAE 90.1-2019 and the 2021 IECC runs from about 0.36 in climate zone 4 to about 0.26 in climate zone 8.

Three habits keep this part straightforward:

  • Read the zone, not the state. Climate zones cross state lines and a single state can hold several.
  • Check the edition your jurisdiction adopted. The requirement that applies is the adopted one, including local amendments, not the newest published edition.
  • Watch the product category. Fixed, operable, entrance doors and skylights carry separate limits, and a schedule that lumps them together will fail somewhere.

Because these are whole-product requirements, they are not satisfied by a centre-of-glass figure or by a film specification read on its own. The number the code wants describes the assembly as installed.

Title 24 Is Not a Variant of the Other Two

California’s energy code is written on its own cycle, with its own compliance documents and its own software.

The 2025 edition took effect on 1 January 2026 and applies to permit applications submitted on or after that date, which must use the 2025 compliance software and forms. The structure has three layers: mandatory measures that apply whatever else you do, then a prescriptive option, then a performance option in which the proposed design must meet an energy budget expressed in source energy and long-term system cost.

Some of the fenestration numbers in the 2025 code, as a sense of how specific it gets:

  • Nonresidential mandatory U-factor of 0.47 for vertical fenestration.
  • Replacement vertical fenestration over 150 ft² must meet a U-factor of 0.58.
  • Single-family mandatory U-factor of 0.40 in all climate zones.
  • Single-family prescriptive U-factor of 0.27 in climate zones 1 to 5, 11 to 14 and 16.
  • Maximum SHGC of 0.23 for single-family alterations, with an exception in climate zone 15.

One structural detail matters more than any single figure. Under the performance approach, new construction has to meet both source energy and long-term system cost, while additions and alterations have to meet long-term system cost only. Retrofit work is therefore assessed differently from new build, which is exactly the situation most film projects are in.

The Part That Matters for Retrofit: Alterations

Most film work happens in existing buildings, which puts it in the part of the code that gets read least and matters most.

The general rule in the commercial code is strict: alterations to any building or structure shall comply with the requirements of the code for new construction. Altered portions must meet those requirements; unaltered portions need not.

That rule then carries a short list of exceptions for work that does not increase the energy use of the building, and two of them are directly relevant to retrofit glazing. Storm windows installed over existing fenestration are listed. So is surface applied window film installed on existing single pane fenestration assemblies to reduce solar heat gain, where the glazing does not otherwise have to be replaced.

Replacement fenestration is treated differently again. Where glazing is replaced it has to meet the applicable U-factor and SHGC requirements, and the overall U-value of the new fenestration must be equal to or lower than that of the existing fenestration.

Repairs are a separate category from alterations, and glass only replacements in an existing sash and frame are classified as repairs rather than alterations.

Read together, those provisions are why the first question on a retrofit is never “what is the SHGC limit?” but “is this an alteration, a replacement or a repair?” Note also that the film exception is written for single pane assemblies, so the same reasoning cannot simply be carried over to an insulated unit.

Where Window Film Sits in the Code

The same film can fall under three different sets of requirements depending on the glazing it goes onto and the scope of the work around it.

ScenarioWhat governsWhat to establish first
New construction or additionFull requirements of the chosen pathWhich code and path the design team is using
Film on existing single pane glazingThe alterations exception for surface applied film, where energy use is not increasedThat the glazing is not otherwise required to be replaced
Film on existing insulated glazingThe general alterations rule, read with the AHJThe glazing construction, and the manufacturer’s position on that construction
Replacing the glazingReplacement fenestration requirementsThe existing U-value, since the new one must be equal or lower
Glass only swap in existing sash and frameThe repairs provisionsWhether the scope really is a repair, in the code’s sense
Any project in CaliforniaTitle 24, Part 6 and its own formsWhether the work is new construction, an addition or an alteration

This table is a starting point for a conversation with the authority having jurisdiction, not a substitute for one. Adopted editions, local amendments and the interpretation of a given scope all sit with the AHJ.

Six Ways Code Questions Go Wrong on Film Projects

None of these involve misreading a number. They involve applying the right number to the wrong project.

  • Treating a model code as law. Neither the IECC nor 90.1 applies anywhere until it is adopted, and the adopted edition may carry local amendments.
  • Mixing documents. Satisfying the IECC envelope table and the 90.1 mechanical provisions is not compliance with either.
  • Quoting the newest edition. The published edition and the adopted edition are frequently years apart.
  • Using a component number against a whole-product requirement. A film specification or a centre-of-glass figure does not answer a requirement written for the assembly as installed.
  • Assuming retrofit triggers full compliance, or that it never does. Alterations generally have to meet new-construction requirements, with specific exceptions. Which side of that line a project falls on is a question of scope.
  • Carrying California rules outward. Title 24 numbers and forms apply in California. They are not a stricter version of the model codes that can be quoted elsewhere.

Every one of these is avoidable with two emails: one to the AHJ confirming the adopted edition and amendments, and one to the design team confirming the compliance path.

Documentation: Which Forms, Which Software

A compliance path is only as good as the paperwork that evidences it, and the tools differ by code.

For the model codes, compliance is normally documented with the DOE tools, REScheck for residential and COMcheck for commercial, which also handle the envelope calculations behind the trade-off paths.

For California, compliance runs on the Energy Commission’s approved software and certificate of compliance forms, and the 2025 code requires permit applications submitted on or after 1 January 2026 to use the 2025 software and documents. Using last cycle’s forms is a rejection, not a detail.

Two practical notes for film work specifically:

  • Performance paths need the assembly numbers for the glazing as it will exist after the work, which means film plus the actual base glass, not the film data sheet alone.
  • Where a project is relying on an alterations exception rather than on a calculated result, the record that matters is the scope of work and the existing glazing construction. Photograph and document both before the film goes on.

How to Check What Applies to Your Project

Five checks, in this order, settle most code questions on a glazing or film project before they become arguments.

Ask the AHJ which edition is adopted, and whether it is amended. That single answer determines every number that follows.

Confirm the compliance path with the design team. Prescriptive, trade-off and performance ask completely different things of the glazing.

Classify the work honestly. New construction, addition, alteration, replacement or repair. The code treats all five differently and the labels are not interchangeable.

Survey the existing glazing before specifying. Single pane or insulated, coated or uncoated, and in what condition. Both the code route and the film selection depend on it.

Get the assembly numbers, not the film numbers. Whatever the path, the requirement is about the glazing as installed.

Establish the Document, Then the Number

Nothing on this page is a substitute for the adopted code text in your jurisdiction, and it is not legal advice.

The codes are not obstacles to solar control work. The performance paths exist precisely so that measures which improve a building can be credited, and the alterations provisions exist so that sensible retrofit is not priced out by a requirement written for new build.

What they do demand is precision about which document, which edition, which path and which category of work. Establish those four, in that order, and the numbers follow without argument.

ProLayers supplies architectural and automotive window film through its dealer network, with published performance data for each product. A dealer can survey the existing glazing and provide the assembly performance figures a compliance calculation needs. Confirm code requirements and their interpretation with your authority having jurisdiction.

Suggested product: Eco Silver 20. UV protection with almost no change in appearance. View the product

FAQ

Frequently asked questions

Six quick answers about energy codes and window film.

Still have a question? Ask us
Do the IECC and ASHRAE 90.1 both apply to my project?

Not at the same time. Where the IECC is adopted, ASHRAE 90.1 is permitted as a compliance alternative for commercial buildings and for residential buildings over three stories, but a project must meet all the requirements of whichever document it follows. Requirements from the two cannot be combined.

Does a model code apply if my state has not adopted it?

No. The IECC and ASHRAE 90.1 have no legal force until a state or local jurisdiction adopts them, and adoption often comes with local amendments. Federal law does require local energy codes to be at least as stringent as ASHRAE 90.1.

Does applying window film to an existing building trigger full code compliance?

Alterations generally have to comply with the requirements for new construction, but the code lists exceptions for work that does not increase the energy use of the building. Surface applied window film installed on existing single pane fenestration assemblies to reduce solar heat gain appears in that list, where the glazing does not otherwise have to be replaced. Confirm the adopted text and its interpretation with your authority having jurisdiction.

Is replacing the glass the same as altering the fenestration?

Not in code terms. Glass only replacements in an existing sash and frame are classified as repairs, while replacement fenestration has to meet the applicable U-factor and SHGC requirements, with the new overall U-value equal to or lower than the existing one.

When did the current California Energy Code take effect?

The 2025 edition of Title 24, Part 6 took effect on 1 January 2026 and applies to permit applications submitted on or after that date, which must use the 2025 compliance software and documents.

Can window film help a building comply?

On a performance or trade-off path, improved solar control can contribute to the result, because those paths assess the building rather than the component in isolation. What the calculation needs is the performance of the glazing as it will exist after the work, meaning the film on the actual base glass rather than the film data sheet alone.

Contact us

Specifying film for a project? Tell us about the glazing.

Send us the glass type, the elevation and the performance you need, and we will point you to the right next step.

Contact us
  • Visit 12551 Steepleway Blvd SWB B101
    Houston, TX 77065
  • Hours Mon to Fri 9am to 5pm
Scroll to Top